Calculate sand, cement and lime quantities for common mortar mixes

Job sections

Section
Build type
Area (m²)
Coats

Materials needed

0.00 m³
Wet mortar volume
0.00 m³
Dry material volume
0.00 m³
Sand (≈ 0.0 t)

Cement bags (25kg)

Lime bags (25kg)

Mortar volume rates and mix ratios are generic approximations for standard construction practice, not an exact match to any one product or specification - actual requirements vary by brick/block size, joint width, workmanship and wastage on site. Always check against the manufacturer's guidance or your specification before ordering materials.

Mix designs

MixRatio (cement:lime:sand)Typical use

Build types

Build typeApprox. mortar volume